Concrete injection machine - List of Manufacturers, Suppliers, Companies and Products

Concrete injection machine Product List

1~8 item / All 8 items

Displayed results

IPH Method Case Study Civil Engineering H27 Arimine Erosion Control Project Road and Other Works

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method). H27 Arimine Erosion Control Project Road and Other Works.

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method) in civil engineering. 【Project Name】 H27 Arimine Erosion Control Work Road and Other Works 【Construction Period】 September 1, 2015 – October 31, 2015 【Project Overview】 Repair work for the foundation of the suspension bridge for erosion control dam management 【Project Purpose】 Repair and reinforcement of the suspension bridge foundation *For more details, please download the catalog or contact us directly.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[IPH Method Case Study Civil Engineering] Akaiwa Bridge Pier Repair Work

This is a case study of the IPH method (Internal Pressure Filling Joint Reinforcement Method). Akaiwa Bridge Pier Repair Work.

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method) case study (civil engineering). 【Project Name】 Akaiwa Bridge Pier Repair Work 【Construction Period】 March 24, 2016 – March 31, 2016 【Project Overview】 Bridge Repair 【Project Purpose】 Cross-section Restoration *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

IPH Method Case Study Civil Engineering: Bancho Tunnel Crack Repair Work

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method). Case study of the Bancho Tunnel crack repair work.

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method) case study (Civil Engineering). 【Project Name】 Bancho Tunnel Crack Repair Project 【Construction Period】 January 28, 2016 – March 24, 2016 *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[IPH Method Case Study Civil Engineering] Bridge Reinforcement Work (Toyoko Bridge)

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method). Case study of bridge reinforcement work (Toyoko Bridge).

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method) case study (Civil Engineering). 【Project Name】 Bridge Reinforcement Work (Toyoko Bridge) 【Construction Period】 October 26, 2015 - March 18, 2016 【Project Overview】 Bridge 【Project Purpose】 Crack Repair *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【IPH Method Case Study Civil Engineering】Replacement of Monkey Bridge Hardware and Other Works

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method). Replacement of the Sarukobashi hardware and other construction work.

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method) in civil engineering. 【Project Name】 Replacement of Hardware for Sarukobashi Bridge and Other Works *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

IPH Method Case Study Civil Engineering Large Oil Refining Plant

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method) used in a large oil refining plant.

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method) case study (Civil Engineering). 【Project Name】 Large Oil Refining Plant 【Construction Period】 January 25, 2016 - February 13, 2016 【Project Overview】 Foundation Columns 【Project Purpose】 Strength Recovery *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

IPM Method Case Study Civil Engineering: Takakuma Bridge Superstructure Repair Work

This is a case study of the IPH method (Internal Pressure Filling Joint Reinforcement Method). Repair work on the Takakuma Bridge superstructure.

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method) case study (Civil Engineering). 【Project Name】 Takakuma Bridge Superstructure Repair Work 【Construction Period】 April to May 2015 【Project Overview】 Bridge 【Project Purpose】 Repair work *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

IPH Method Case Study: Repair Work on Sakaebashi Bridge

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method). Rehabilitation work on the Sakaebashi Bridge.

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method) case study (Civil Engineering). 【Project Name】 Comprehensive Grant for Major Local Road Toyama Kosugi Line Outer Road (Disaster Prevention, Repair, Inspection) Sakaebashi Outer Repair Work 【Construction Period】 October 5, 2015 – March 10, 2016 【Project Overview】 Bridge 【Project Purpose】 Repair *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration